ABOUT THE PROJECT
In the course of construction, the eastern wing of the building was renovated, connecting it to the already built volume of the hospital, thus improving the availability and quality of health care services. As part of the reconstruction, extensive internal works were carried out, dismantling the internal load-bearing walls, rebuilding engineering networks and creating appropriate medical facilities with modern technological equipment.
The ART8 team carried out the supply and installation of the Forbo PVC vinyl floor and the supply and installation of the Gerflor PVC wall vinyl. Bostik materials are used for base preparation and gluing.