The reconstruction of the factory building built at the turn of the 19th and 20th centuries and the construction of the building took place in the place where several factories once worked, until it was taken over by the State Electrotechnical Factory or VEF in 1928.
The ART8 team carried out the installation of raised floors in an area of more than 5,600 m2.