NEW BUILDING OF RTU SCIENTIFIC LIBRARY

RIGA, LATVIA

06.2015 - 10.2015

ABOUT PROJECT

The new building of the RTU Scientific Library and the existing central library became a single building. In the new part of the library, various reading rooms were created - a 24-hour reading room, a rarity reading room, a teaching staff reading room, a quiet reading room, a reading room for parents with children, individual booths and group rooms. There is now also a large conference room.

ART8 supplied and assembled PVC floor coverings. Bostik Primer 6000 primer and Bostik Combi end filler were used in the preparation of the substrate. Only Bostik Attack glue was used for gluing. In addition, the PVC covering of the stairs was delivered and assembled.

GENERAL CONTRACTORS

  • LNK Industries AS

ARCHITECTS

  • Ugis Senbergs Arhitekts SIA

MATERIALS

  • PVC vinyl Forbo Sarlon - 2500.0 m2
  • Stair PVC vinyl Forbo Complete step - 250.0 m2

ADDITIONAL

  • MDF skirting boards with PVC vinyl finish - 1500.0 rm

GALLERY

NEXT PROJECT

Kviberg's ice and sports hall