ABOUT PROJECT
The new laboratory building is equipped with the equipment necessary for high-level research and complex expertise, with the help of which RTU scientists can carry out international scientific activities and develop research for Latvian and foreign companies, thus promoting the competitiveness of companies. The laboratory building includes the laboratories of the National Research Center for Sustainable Use of Energy and Environmental Resources and the laboratories of the RTU Faculty of Transport and Mechanical Engineering. Thus, a gradual relocation of TMF from its headquarters in Mežparks to the RTU single territorial complex in Ķīpsala has started.
The subfloor was prepared using Bostik 6000 primer and Bostik Combi end filler. Bostik Linotac glue was used to assemble the natural linoleum, while Bostik Conductiveattack glue was used to assemble the conductive cover.