ABOUT PROJECT
During the construction, the east wing of the building was renovated, linking it with the already built volume of the hospital, thus improving the availability and quality of health care services. Extensive interior works have been carried out as part of the reconstruction, dismantling the internal non-load-bearing walls, rebuilding the engineering networks and creating appropriate medical premises with modern technological equipment.
The ART8 team delivered and installed PVC vinyl for Forbo floors and PVC vinyl for Gerflor walls. Bostik materials were used to prepare and glue the substrate.