RECONSTRUCTION OF THE JŪRMALA STATE GYMNASIUM BUILDING

JURMALA, LATVIA

09.2021 - 06.2022

ABOUT PROJECT

At the beginning of September 2022, the renovated building of the Jūrmala State Gymnasium, located in Kauguros, on Raina Street 55, was put into operation. The gymnasium building has undergone a large-scale reconstruction, the renovation and modernization of the interior has been completed. The renovation works of the four-story high building took one and a half years, the school was completely rebuilt. The visual image of the school building, or the facade, is adapted to the color range of the adjacent gymnasium, while in the interior, each of the floors of the building is created in a different color tone, with careful attention to detail.

The ART8 team in collaboration with REATON Ltd supplied and installed the flooring and skirting boards. Bostik products were used in auxiliary materials - Bostik putty, Bostik primer and Bostik glues. The works were completed within 10 months.

GENERAL CONTRACTORS

  • ProDev SIA

ARCHITECTS

  • Projektēšanas birojs Austrumi SIA

MATERIALS

  • LVT vinyl Forbo Allura - 320.0 m2
  • Natural linoleum Forbo Marmoleum - 2900.0 m2

ADDITIONAL

  • Produced and assembled MDF baseboards with linoleum finish - 2500.0 rm