ABOUT THE PROJECT
The construction area of four floors is 958 m2, and the total area is 3160 m2. An auditorium with auxiliary rooms for 160 visitors has been arranged on the basement level, which may also be used for extracurricular events, being functionally separated from the rest of the volume. On this floor, there is also a cloakroom for the entire number of students of the newly built volume and a storage room for library books. On the 1st floor, there are two auditoriums with the possibility of combining them into one. A library reading room, a conference room and a teacher’s room with work and rest areas were also built. On the 2nd and 3rd floors there are four classrooms with the possibility of combining two of them.
The ART8 team supplied and installed Tarkett PVC flooring, Ege carpet flooring and MDF skirting with PVC vinyl finish. Bostik primer and Bostik end putty were used to prepare the base, while Bostik Startac Combi glue was used for gluing.