ABOUT THE PROJECT
The new building of RTU Scientific Library and the existing central library became a single building. Various reading rooms were created in the new part of the library – a 24-hour reading room, a rare reading room, a teaching staff reading room, a quiet reading room, a reading room for parents with children, individual booths and group rooms. There is also now a spacious conference room.
ART8 supplied and installed PVC flooring. The primer Bostik Primer 6000 and the final putty Bostik Combi were used in the preparation of the base. Only Bostik Attack glue is used for gluing. In addition, the PVC covering of the stairs was supplied and installed.