ABOUT THE PROJECT
The new laboratory building is equipped with the equipment necessary for conducting high-level research and complex expertise, with the help of which RTU scientists can carry out international scientific activities and develop research for companies in Latvia and other countries, thereby promoting the competitiveness of companies. The laboratory building includes the laboratories of the National Research Center for Sustainable Use of Energy and Environmental Resource Extraction Technologies and the laboratories of the Faculty of Transport and Mechanical Sciences of RTU. Thus, the gradual relocation of TMF from its seat in Mežparka to the unified territorial complex of RTU in Ķipsala has been started.
The substrate was prepared using Bostik 6000 primer and Bostik Combi end putty. Bostik Linotac adhesive was used for natural linoleum assembly, while Bostik Conductiveattack adhesive was used for conductive flooring assembly.